Gemaal Oude en Nieuwe Broekpolder
Consort

Gemaal Oude en Nieuwe Broekpolder

The Oude en Nieuwe Broekpolder pumping station was built in 1881 to drain the polder area. The water at the pumping station is 2 meters below NAP and is raised 1.6 meters to the level of the Kromme Zweth. In the beginning the pumping station was powered by a steam engine, in 1920 it was switched to a diesel engine and it is now electrically powered.

Visit us

Zweth 44C
2675LB Westland
South Holland The Netherlands

Share this point of interest

See Routiq in...
  • Routiq Logo Routiq App
  • Browser Browser