Living down the line

W03-Tiel - Inundatiekanaal

Visit the website
A straight, three-kilometer-long canal that connects the Waal with the Linge runs right through Tiel. Few know that this was part of the New Dutch Waterline. If Holland was in danger, the lock in Tiel was opened. As a result, the Linge received more water and was able to flood the land 20 km downstream.

Visit us


4005EL Tiel
Gelderland The Netherlands

Share this point of interest

See Routiq in...
  • Routiq Logo Routiq App
  • Browser Browser
x